OA
CN

Danger elimination and reinforcement project of key (II) reservoir in Duchang County

Danger elimination and reinforcement project of key (II) res...
Danger elimination and reinforcement project of key (II) reservoir in Duchang County,the total construction period is 165 days and the total investment is 2814399.28 Yuan.

The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city

The Renovation project from Binjiang hotel to Guantang secti...
The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city is located in the urban area of Guanyang County, with a total construction period of 30 days and a total investment of 18132288 Yuan.

Small Hydropower station in Anhua County, Hunan Province

Small Hydropower station in Anhua County, Hunan Province
Small Hydropower station in Anhua County, Hunan Province.

High standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011

High standard farmland construction demonstration project of...
The total construction period of high standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011 is 120 days and the total investment is 3675699.44 Yuan.

Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project

Yichun Shanggao County in 2011, 40 small reservoirs reinforc...
Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project, with a total investment of 4144142.57 Yuan.

Longtan Hydropower Station in Guangxi Province

Longtan Hydropower Station in Guangxi Province
As the "West-to-East Power Tansmission" landmark project and the key project of the western development,Longtan Hydropower Station is the second largest hydropower station in China following the Three Gorgers Hydropower Station. The design water level is 400 meters, the dam height is 216.5 meters, the dam crest length is 836 meters, the storage capacity is 27.3 billion cubic meters, the installed capacity is 6.3 million kilowatts, and the annual power generation capacity is 18.7 billion kilowatt-hours.
目前在第1页, 共有1页, 共有6条记录 第一页 上一页 1 下一页 最后一页 跳转到